by Taifitop | Sep 4, 2026 | Case Studies and Results
Case Study from Taifitop Asia The Challenge Plate heat exchanger macrofouling kept blocking the seawater channels despite screening and chlorination Mussels and barnacles restricted the seawater channels Biofilm impaired heat rejection across the PHE plates Higher…
by Taifitop | Sep 2, 2026 | Case Studies and Results
Case Study from QEQI® Italy The Challenge Pump impellers became blocked by heavy scale deposits Engine overheating resulted from scaling buildup Acid cleaning was necessary every three months Metal rings and hydraulic joints experienced cracking The Solution A…
by Taifitop | Sep 1, 2026 | Case Studies and Results
Case Study from QEQI® USA The Challenge Cooling tower bio-count reduction was needed without giving up the site’s water-saving strategy Bio-counts reached approximately 100,000 CFU The required target was below 10,000 CFU Running at high cycles of…
by Taifitop | Sep 1, 2026 | Case Studies and Results
The Challenge Hot water pipework biofouling had built up across both new and decades-old sections Thick biofouling deposits altered water quality Rust layers and flakes accumulated inside the pipework Scale was also present inside the water-supply pipes The building…
by Taifitop | Sep 1, 2026 | Case Studies and Results
Case Study from QEQI® Canada The Challenge Boiler water treatment ROI had to be proven before a wider portfolio rollout Visible scale build-up developed within three months on a relatively new boiler Scale threatened boiler heat-transfer efficiency The system…