by Taifitop | Jun 3, 2026 | Case Studies and Results
The Challenges Backwashing required every 48 hours High chlorine dosing required Strong chlorine odour present Algae growth affecting water clarity The Solution One QEQI® P-160 unit was fitted before the pump on 130mm GI pipe in August 2019, serving two pools of…
by Taifitop | Jun 3, 2026 | Case Studies and Results
Case Study from QEQI® France The Challenges High backwash water consumption per wash 78 filter washes per year Heated chlorinated water wasted during washes Rising operating costs from water and energy use The Solution One QEQI® P160 unit was fitted upstream…
by Taifitop | Jun 3, 2026 | Case Studies and Results
Case Study from QEQI® USA The Challenges High water use from blow-down cycles Continuous chemical dosing required Water scarcity affecting operations Need to stay within industry standards The Solution One QEQI® i8″ Custom unit was fitted to the…
by Taifitop | Jun 3, 2026 | Case Studies and Results
Case Study from QEQI® USA The Challenges Scale and biofouling building up in the system High chemical dosing required Frequent maintenance and blowdown Ongoing maintenance and energy costs The Solution QEQI® Custom units were installed across the cooling…
by Taifitop | Jun 3, 2026 | Case Studies and Results
Case Study from QEQI® USA The Challenges Conductivity kept low to limit fouling High chemical dosing required for control Risk of biofilm and scale formation Cooling efficiency limited by deposits The Solution QEQI® Custom units were fitted to condenser…