Real results from real installations
Discover how Taifitop® technology delivers sustainable, chemical-free water treatment across industries and continents.
94 results

Waikiki Hotel: Dishwasher Water Spots Cut in 60 Days
Hilton Prince Kuhio Waikiki cut dishwasher water spotting on dishes and glassware within 60 days using one QEQI® S38 on the pump line.

Redwood Inn: Six Months With No Hot Water Tank Clean
The 92-suite Redwood Inn in Alberta went six months with no hot water tank cleaning, down from every six weeks, with one QEQI® C100.

Comano: Legionella Under 10 CFU/L for Seven Months
Grand Hotel Terme di Comano brought every certified Legionella sample below 10 CFU/L and stayed within limits for seven months with three QEQI® units.

San Antonio Hotel: Heater Cleaning Cut 75% at 21 GPG
A 136-room San Antonio hotel on 357 ppm water restored hot water flow and cut heater cleaning by 75% with two QEQI® i100 units.

Italy Food Plant: 99.95% E. coli Cut in 21 Hours
Cesarin S.p.A. cut microbial load in fermented pepper concentrate by up to 99.95% with a QEQI® i45 on a 300L pilot recirculation system.

Augusta Belt Presses: $4,000 a Month in Chemicals Cut
The J. P. Messerly plant in Augusta cut anti-scalant dosing to zero on two belt presses with one QEQI® i160, saving roughly $4,000 a month.

Orlando Belt Press: Pan Scale 5 mm to 1 mm in 150 Days
Orlando's Water Conserv II ran belt press No. 5 for 150 days without cleaning, cutting pan scale from 5 mm to 1 mm and polymer use by around 20%.

London Ohio: Half the Roller Holes Open in 35 Days
The City of London Wastewater Department cleared over half its belt press first-roller holes in a 35 day trial, with no chemical or mechanical cleaning.

Utah Screw Press: 30 Hours of Cleaning Down to Four
A Utah plant stopped $8,000 a month of struvite chemical and cut screw press cleaning from 30 hours to under four with one QEQI® Custom 8 inch unit.