Real results from real installations
Discover how Taifitop® technology delivers sustainable, chemical-free water treatment across industries and continents.
94 results

Denver: Transfer Pump Struvite Cut, Four Units Bought
Denver's Robert W. Hite Treatment Facility softened heavy transfer pump struvite over 60 days, then installed four more QEQI® units.

Tulsa: No New Struvite on the Test Drum in 90 Days
Tulsa Southside WWTP kept a cleaned belt press drum free of new struvite for 90 days, then funded treatment for the header serving all five presses.

Walla Walla: Scale Returned When the Unit Was Off
A cleaned belt press drum at Walla Walla stayed struvite-free for eight weeks, then scaled again within weeks of the QEQI® unit being switched off.

US Apple Packer: 14 Extra Years From Ageing Heaters
A US apple packing facility cut industrial water heater limescale by over 70% in three months and kept three ageing heaters running for another 14 years.

Yakima Condensers: Chemicals Out, ROI in About a Year
G & G Orchards in Yakima eliminated condenser treatment chemicals for 12 months, cut blowdown below once a month and saw an ROI of roughly one year.

PepsiCo Walkers: 24 Weeks of Clear 200-Micron Nozzles
PepsiCo Walkers in Leicester kept 200 micron spray nozzles clear for 24 weeks with one QEQI® i45, ending weekly acid cleaning and production stoppages.

Kyiv Brewery: Filter Contamination Cut 60%, No Chemicals
Obolon Brewery in Kyiv cut mechanical filter contamination by 60% and cleared black biofouling across three cooling water trials with one QEQI® unit.

US Apple Flume: Non-Detect at 80% Less Chlorine
A US apple packing facility held non-detect microbial results at 10 ppm chlorine, down from 40-50 ppm, with one QEQI® unit on its flume water.

US Convenience Chain: Scale Cut Across 30+ Stores
A 400+ location gas station and convenience store chain cut scale and biofilm across food equipment and water systems, with ROI inside 6–12 months.