
San Antonio Hotel: Heater Cleaning Cut 75% at 21 GPG
A 136-room San Antonio hotel on 357 ppm water restored hot water flow and cut heater cleaning by 75% with two QEQI® i100 units.

A 136-room San Antonio hotel on 357 ppm water restored hot water flow and cut heater cleaning by 75% with two QEQI® i100 units.

A Palm Springs car wash reused 60% of its water and cut reclaimed water odours with QEQI® i60 and HS40 units.

A dairy farm in Aguadulce cut cleaning chemical use and extended cleaner life from 15 to 22 days on its raw milk piping.

PepsiCo Walkers in Leicester kept 200 micron spray nozzles clear for 24 weeks with one QEQI® i45, ending weekly acid cleaning and production stoppages.

Three QEQI® units controlled scale feeding 40 moulding machines at an injection moulding manufacturer in the Philippines, cleaning now yearly.

A six month trial at Bucharest’s Palace of Parliament cut hot water pipework biofouling by about 50% in both new and 30+ year-old pipe sections.

A QEQI® i160 enabled chemical-free cooling tower operation at Nellis Air Force Base with no scale or biofouling return.

Northview REIT’s 180-unit London, Ontario building ended Parafoss dosing and calculated minimum annual savings of $11,639 with two QEQI® i60 units.

The Kantor desalination plant cut biofouling on its RO systems with three QEQI® i100 units, lifting peak recovery to 81% and cartridge life to 250 days.

A Rosemount trucking company broke down existing boiler scale with a QEQI® i45, cutting stack temperature 24°F and reaching payback in 5.8 months.
Get in touch to find out how QEQI® can work for you.
Contact Us