
Poland Moulding: Softeners Removed, Cycle Time Cut
QEQI® P120 and S38 units cut scale and biofilm in an injection mould cooling system at METCHEM, Poland.

QEQI® P120 and S38 units cut scale and biofilm in an injection mould cooling system at METCHEM, Poland.

A Palm Springs car wash reused 60% of its water and cut reclaimed water odours with QEQI® i60 and HS40 units.

A six month trial at Bucharest’s Palace of Parliament cut hot water pipework biofouling by about 50% in both new and 30+ year-old pipe sections.

MV Detroit Express cut fresh water generator CIP cleaning 86% and dropped chemicals with a QEQI® HM-100 unit.

A QEQI® i160 enabled chemical-free cooling tower operation at Nellis Air Force Base with no scale or biofouling return.

The Kantor desalination plant cut biofouling on its RO systems with three QEQI® i100 units, lifting peak recovery to 81% and cartridge life to 250 days.

Obolon Brewery in Kyiv cut mechanical filter contamination by 60% and cleared black biofouling across three cooling water trials with one QEQI® unit.

A QEQI® unit enabled chemical-free cooling tower operation at Children’s Hospital, Las Vegas, releasing scale.

An Indiana hospital cut Legionella from 7 CFU/mL to below 1 CFU/mL in 16 days with QEQI® units on its potable water line and ice machine feeds.

QEQI® treatment removed condenser biofilm and lifted COP 10-15% across five seawater cooled chiller plants.
Get in touch to find out how QEQI® can work for you.
Contact Us