Hong Kong Retail Portfolio: Scale Gone in 12 Months, 100+ Units
A QEQI® pilot removed condenser scale within 12 months, leading to 100+ units across 50+ Hong Kong malls.

A QEQI® pilot removed condenser scale within 12 months, leading to 100+ units across 50+ Hong Kong malls.

A 700MW Great Lakes power plant cut scale and corrosion inhibitor use by 75.5% and saved 200 million gallons a year across its 10-cell cooling tower.

Half Moon Resort in Jamaica went eight months without removing a hot water heater for cleaning, down from monthly, with one QEQI® C150.

A Fortune 100 HQ in Houston cut blowdown 85% and chemicals 75% across its cooling towers and chillers with QEQI® units.

A French holiday home residence cut hot water cylinder limescale from 200 kg a year to under 10 kg with two QEQI® C60 units, saving €1,750 a year.

Three QEQI® i130 units cut calcium deposits up to 75% in recycled water dosing lines at a Czech precast concrete plant.

Two 600MW steam condensers freed from chemical dosing and hard scale on Yuen River cooling water.

A Middle East cement plant stopped daily cleaning of 24 gas conditioning tower nozzles using a QEQI® C120 unit.

Copper mining operations in Chile reduced scale buildup and improved flow reliability across large diameter water pipelines with external QEQI® units.

Two QEQI® Multihead 50″ units cut bacteria 97% and improved condenser performance at an LNG power plant in China.