by Taifitop | Jun 4, 2026 | Case Studies and Results
Case Study from QEQI® USA The Challenges Recirculating wastewater had a murky appearance Microbial contamination causing strong foul odours Chlorine and polymer dosing needing reduction Cleaning and water replacement too frequent The Solution One QEQI® i150…
by Taifitop | Jun 4, 2026 | Case Studies and Results
Case Study from QEQI® Italy The Challenges High turbidity in discharge water Heavy reliance on polyelectrolyte dosing Inconsistent output with turbidity peaks Need to improve efficiency without more chemicals The Solution One QEQI® P60 unit was fitted to the…
by Taifitop | Jun 4, 2026 | Case Studies and Results
Case Study from Taifitop The Challenges High polymer dosing needed on dewatering Risk of floc loss at lower dose Cake dryness to be held near 21% for the THP Centrate quality to stay within process limits The Solution One QEQI® i160 unit was fitted to the…
by Taifitop | Jun 4, 2026 | Case Studies and Results
Case Study from Taifitop The Challenges Floc unstable when polymer dosing was reduced High polymer dosing required to hold stability Risk of floc breakdown at lower dosing Belt press operation became unstable The Solution One QEQI® i120 unit was fitted to the…
by Taifitop | Jun 4, 2026 | Case Studies and Results
The Challenges Ferric dosing fixed at 200 ppm High chemical cost and carbon impact System running near operational limits Risk of fines if limits exceeded The Solution Two QEQI® Custom units (12″ and 14″) were fitted to the DAF feed lines in October…