by Taifitop | Jun 4, 2026 | Case Studies and Results
Case Study from QEQI® USA The Challenges High algae and biofouling in the baths Heavy chemical dosing required Frequent blowdowns and water usage High TDS, bacteria and algae levels The Solution One QEQI® i150 unit was fitted to a 6″ fibreglass pipe in…
by Taifitop | Jun 4, 2026 | Case Studies and Results
The Challenges High antiscalant chemical dosing required Ongoing chemical costs and monitoring Risk of calcium carbonate scaling in exchangers Continuous adjustments needed The Solution Three QEQI® Custom 24″ units were fitted to the heat exchanger inlet…
by Taifitop | Jun 4, 2026 | Case Studies and Results
The Challenges Pipeline scaled up twice every year Pump and pipeline needing acid cleaning Downtime affecting continuous production Scale reducing flow performance The Solution One QEQI® P60 unit was fitted to protect the pump and one i100 unit to protect the…
by Taifitop | Jun 4, 2026 | Case Studies and Results
The Challenges Scale and biofouling affecting boilers Chemical dosing regularly required Limited equipment protection Chemical dosing conflicting with sustainability goals The Solution Two QEQI® I-120 units were installed on the boiler systems at the North and…
by Taifitop | Jun 4, 2026 | Case Studies and Results
The Challenges 4 to 8 spray nozzles cleaned every day Cartridge filters clogging with scale Hard water accelerating scale formation Extreme heat increasing scaling conditions The Solution One QEQI® C120 unit was fitted to the nozzle supply line after the…