by Taifitop | Jun 3, 2026 | Case Studies and Results
Case Study from Taifitop Asia The Challenges Critical scale build-up in the boiler system Safety valve failures during operation Chemical descaling prohibited by food rules Frequent downtime disrupting production The Solution One QEQI® P Range unit was…
by Taifitop | Jun 3, 2026 | Case Studies and Results
Case Study from QEQI® Ukraine The Challenges Hard calcite deposits up to 12mm thick Sludge, biofilm and putrefactive odour Snails found inside heat exchange tubes Frequent cleaning as performance deteriorated The Solution Two QEQI® Industrial units were…
by Taifitop | Jun 3, 2026 | Case Studies and Results
Case Study from Taifitop Asia The Challenges Biofilm and scaling requiring chemical dosing Condensers cleaned every 4 to 6 months Bacteria count at 300,000 CFU Performance losses in steam condensation The Solution Two QEQI® Multihead 50″ units were fitted…
by Taifitop | May 10, 2026 | Case Studies and Results
Case Study from QEQI® USA The Challenge Hard water scale on apples formed even though acid was added to the spray water The deposits did not rub off and reduced the grade of the apples Only around 50% typically received the highest grade in an average season…
by Taifitop | May 1, 2026 | Case Studies and Results
Case Study from K2 Group The Challenges Daily chemical cleaning needed after every milking session High consumption of milk scale remover and alkaline cleaner Extraordinary deep clean required every 21 days Frequent corrective and preventive maintenance on the piping…