by Taifitop | Aug 10, 2026 | Case Studies and Results
Case Study from QEQI® Tunisia The Challenge Drip irrigation clogging affected more than 50% of emitters Well restart flushing took 30 minutes or more Weekly flushing and acid injection were required Daily winter restarts increased water loss and labour…
by Taifitop | Aug 3, 2026 | Case Studies and Results
The Challenge High TDS irrigation water from the site’s wells limited germination and yield Underground water carried high salt and calcium levels TDS readings were around 2000–2400 Canal water was not normally available for the comparison plots Poor germination…
by Taifitop | Jul 25, 2026 | Case Studies and Results
Case Study from QEQI® USA The Challenge Quarterly tests showed Legionella above the 1 CFU/mL target Average contamination level reached 7 CFU/mL Flushing and equipment replacement were expensive A $75,000 treatment system was being considered The Solution A…
by Taifitop | Jul 23, 2026 | Case Studies and Results
Case Study from QEQI® Chile The Challenge Mussels and marine organisms built up inside suction lines Blockages reduced flow and affected operational efficiency Frequent maintenance was needed due to fouling regrowth Chemical dosing risked higher cost and…
by Taifitop | Jul 23, 2026 | Case Studies and Results
Case Study from QEQI® Italy The Challenge Water hardness of approximately 840 ppm CaCO₃ Scaling risk to RO membranes Chemical dosing required for control Risk to pipes, tanks and equipment The Solution One QEQI® iCustom 16″ unit was installed in May…