The Challenges
- Condenser tubes cleaned with acid yearly
- Cooling towers cleaned twice yearly
- Scale build-up lowering chiller efficiency
- Continuous chemical treatment required
The Solution
One QEQI® unit was fitted to the city water cooled chiller system serving two 180 TR chillers. The signal disrupts the conditions that bond scale to surfaces, so existing deposits reduce over time and heat transfer improves, lifting efficiency by 16% over a year.



