Yakima Condensers: Chemicals Out, ROI in About a Year
G & G Orchards in Yakima eliminated condenser treatment chemicals for 12 months, cut blowdown below once a month and saw an ROI of roughly one year.

G & G Orchards in Yakima eliminated condenser treatment chemicals for 12 months, cut blowdown below once a month and saw an ROI of roughly one year.

A cleaned belt press drum at Walla Walla stayed struvite-free for eight weeks, then scaled again within weeks of the QEQI® unit being switched off.

A Yakima Valley fruit grower turned hard scale on apples into a removable powder and cleared its irrigation pond with one QEQI® custom 12 inch unit.

A 2.3 million sq ft US office complex cut cooling tower bio-counts from 100,000 CFU to below 1,000 within days with one QEQI® Custom 14 inch unit.

A Utah plant stopped $8,000 a month of struvite chemical and cut screw press cleaning from 30 hours to under four with one QEQI® Custom 8 inch unit.

Hilton Prince Kuhio Waikiki cut dishwasher water spotting on dishes and glassware within 60 days using one QEQI® S38 on the pump line.

A US apple packing facility held non-detect microbial results at 10 ppm chlorine, down from 40-50 ppm, with one QEQI® unit on its flume water.

A US apple packing facility cut industrial water heater limescale by over 70% in three months and kept three ageing heaters running for another 14 years.

QEQI® i100 units controlled boiler scale across US concrete plants for 6 years, cutting maintenance and chemical use.

A QEQI® C60 unit released scale and dropped water softener chemicals at an injection moulding manufacturer in Thailand
Get in touch to find out how QEQI® can work for you.