
Nellis AFB: Chemical-Free Cooling, No Scale Return
A QEQI® i160 enabled chemical-free cooling tower operation at Nellis Air Force Base with no scale or biofouling return.

A QEQI® i160 enabled chemical-free cooling tower operation at Nellis Air Force Base with no scale or biofouling return.

QEQI® P60 and i100 units eliminated twice-yearly acid cleaning of a cement process pipeline at Xella’s Meppel factory.

Northview REIT’s 180-unit London, Ontario building ended Parafoss dosing and calculated minimum annual savings of $11,639 with two QEQI® i60 units.

A 5-month trial cleared heavy scale from a shell-and-tube heat exchanger and lifted performance without chemical dosing.

Two QEQI® HM45 units replaced the UV steriliser on M/V Harvest Leader, keeping drinking water bacteria-free.

A QEQI® HM120 controlled scale on M/V Hermes Leader’s fresh water generator, with scale detaching easily at 4,000 hours.

Two QEQI® HM45 units replaced the UV steriliser on M/V Hermes Leader, keeping drinking water bacteria-free.

The City of London Wastewater Department cleared over half its belt press first-roller holes in a 35 day trial, with no chemical or mechanical cleaning.

A QEQI® unit prevented further struvite scaling in centrate lines at Thames Water’s East Hyde works in Luton.

Obolon Brewery in Kyiv cut mechanical filter contamination by 60% and cleared black biofouling across three cooling water trials with one QEQI® unit.
Get in touch to find out how QEQI® can work for you.
Contact Us