
Yorkshire WWTP: 11% Less Polymer in Dewatering
QEQI® i160 cut polymer demand 11% in sludge dewatering at Yorkshire Water’s Esholt plant, output quality held.

QEQI® i160 cut polymer demand 11% in sludge dewatering at Yorkshire Water’s Esholt plant, output quality held.

A cleaned belt press drum at Walla Walla stayed struvite-free for eight weeks, then scaled again within weeks of the QEQI® unit being switched off.

A Utah plant stopped $8,000 a month of struvite chemical and cut screw press cleaning from 30 hours to under four with one QEQI® Custom 8 inch unit.

Tulsa Southside WWTP kept a cleaned belt press drum free of new struvite for 90 days, then funded treatment for the header serving all five presses.

A Houston packaging facility cut polymer and chlorine 50% and extended its DAF cleaning cycle from 1 to 6 weeks.

Orlando’s Water Conserv II ran belt press No. 5 for 150 days without cleaning, cutting pan scale from 5 mm to 1 mm and polymer use by around 20%.

Two QEQI® Custom units cut ferric chloride dosing up to 50% while holding discharge compliance at a Hamilton food WWTP.

A QEQI® unit prevented further struvite scaling in centrate lines at Thames Water’s East Hyde works in Luton.

The City of London Wastewater Department cleared over half its belt press first-roller holes in a 35 day trial, with no chemical or mechanical cleaning.

A QEQI® P60 unit cut polyelectrolyte use 20% and reduced turbidity at Global Carni’s flotation plant in Italy.
Get in touch to find out how QEQI® can work for you.
Contact Us