
Saudi Olive Grove: Flushing Cut from 30 Minutes to 2
A 60,000 hectare farm in Al Jouf cut well restart flushing from 30 minutes to 2 and reduced emitter clogging risk by up to 50% with four QEQI® units.

A 60,000 hectare farm in Al Jouf cut well restart flushing from 30 minutes to 2 and reduced emitter clogging risk by up to 50% with four QEQI® units.

A six month trial at Bucharest’s Palace of Parliament cut hot water pipework biofouling by about 50% in both new and 30+ year-old pipe sections.

QEQI® P60 and i100 units eliminated twice-yearly acid cleaning of a cement process pipeline at Xella’s Meppel factory.

An Italian gypsum mine kept its dewatering pump operational with a custom 200mm QEQI® unit on a 700m pipeline, replacing three-monthly acid cleaning.

Three QEQI® i130 units cut calcium deposits up to 75% in recycled water dosing lines at a Czech precast concrete plant.

Denver’s Robert W. Hite Treatment Facility softened heavy transfer pump struvite over 60 days, then installed four more QEQI® units.

Copper mining operations in Chile reduced scale buildup and improved flow reliability across large diameter water pipelines with external QEQI® units.

A Chile desalination plant kept its seawater intake line clear of mussels for 223 days with a QEQI® Custom i20″ unit, while the control line fouled.

A 6-month trial cleared marine growth from a 200mm seawater line feeding a heat exchanger at Cape Town’s V&A Waterfront.
Get in touch to find out how QEQI® can work for you.
Contact Us