
Yorkshire WWTP: 11% Less Polymer in Dewatering
QEQI® i160 cut polymer demand 11% in sludge dewatering at Yorkshire Water’s Esholt plant, output quality held.

QEQI® i160 cut polymer demand 11% in sludge dewatering at Yorkshire Water’s Esholt plant, output quality held.

A cleaned belt press drum at Walla Walla stayed struvite-free for eight weeks, then scaled again within weeks of the QEQI® unit being switched off.

A Utah plant stopped $8,000 a month of struvite chemical and cut screw press cleaning from 30 hours to under four with one QEQI® Custom 8 inch unit.

Tulsa Southside WWTP kept a cleaned belt press drum free of new struvite for 90 days, then funded treatment for the header serving all five presses.

Orlando’s Water Conserv II ran belt press No. 5 for 150 days without cleaning, cutting pan scale from 5 mm to 1 mm and polymer use by around 20%.

A QEQI® unit prevented further struvite scaling in centrate lines at Thames Water’s East Hyde works in Luton.

The City of London Wastewater Department cleared over half its belt press first-roller holes in a 35 day trial, with no chemical or mechanical cleaning.

Denver’s Robert W. Hite Treatment Facility softened heavy transfer pump struvite over 60 days, then installed four more QEQI® units.

A QEQI® i120 trial at Thames Water Banbury improved belt press floc stability, cutting polymer dosing while holding output.

The J. P. Messerly plant in Augusta cut anti-scalant dosing to zero on two belt presses with one QEQI® i160, saving roughly $4,000 a month.
Get in touch to find out how QEQI® can work for you.
Contact Us