Walla Walla: Scale Returned When the Unit Was Off
A cleaned belt press drum at Walla Walla stayed struvite-free for eight weeks, then scaled again within weeks of the QEQI® unit being switched off.

A cleaned belt press drum at Walla Walla stayed struvite-free for eight weeks, then scaled again within weeks of the QEQI® unit being switched off.

A Utah plant stopped $8,000 a month of struvite chemical and cut screw press cleaning from 30 hours to under four with one QEQI® Custom 8 inch unit.

Tulsa Southside WWTP kept a cleaned belt press drum free of new struvite for 90 days, then funded treatment for the header serving all five presses.

Orlando’s Water Conserv II ran belt press No. 5 for 150 days without cleaning, cutting pan scale from 5 mm to 1 mm and polymer use by around 20%.

The City of London Wastewater Department cleared over half its belt press first-roller holes in a 35 day trial, with no chemical or mechanical cleaning.

A QEQI® unit prevented further struvite scaling in centrate lines at Thames Water’s East Hyde works in Luton.

Denver’s Robert W. Hite Treatment Facility softened heavy transfer pump struvite over 60 days, then installed four more QEQI® units.

The J. P. Messerly plant in Augusta cut anti-scalant dosing to zero on two belt presses with one QEQI® i160, saving roughly $4,000 a month.
Get in touch to find out how QEQI® can work for you.